The electrician came today to wire an outlet for my
Kiln. I need to finish hooking up the controller and to buy some witness cones to replace the ones that shipped with the kiln so that I can test fire.
Tonight I'm bisque firing the heart pendants that I'm working on for
The Sampler. I also have some callus "stones", the skull masks and doll faces, and some other doll faces all in the kiln. The idea is that I should be able to glaze them while the kiln is going through it's inital test firing and then glaze fire them later in the week. I have a lot of beads and stuff to glaze and fire.
While the electrician was here anyway, we had him run an outlet for my old bench furnace. When I bought the small kiln, I had the guy at Vulcan re-wire the bench furnace since I had accidentally over-fired it. The kiln is now wired for 120V and fires to 1650 on household current so that I can use it for PMC. I'm thinking that I should be able to do some limited raku firing using the bench furnace as well. It is at least worth experimenting with.
Other than that, I've spent most of the last two days working on adding
tags to the blog. Hopefully the tags will increase the utility of the blog and make it easier for me to find my
website notes. It doesn't do me any good to write down my plans for
my website if I can't find my notes to follow up on them.